Wednesday, April 3, 2013

Walk through

So Urban Edge invited us to a walk through of the in-progress house.

We had been checking up on/from the outside and really couldn't see much of what was going on inside the house.

Today we got a look.  And we're quite happy with things.  The taps are working, the lights are working.   The tiles are in, the paint is (mostly) done.

So here are some pictures of the kitchen and the bathrooms.  The mirrors are still missing in the bathrooms, and the kitchen needs a fair bit of work to go - the bottom middle panel of the overhead cupboards is wrong and is being replaced with a while panel to match the rest.  There are also a few panels that will need replacing.

The bathrooms are looking great with the so much already done.

En suite, with dual showers and individual mixers.


En suite, missing the mirrors and feature tiles.

Work in progress

Bathroom